Services

Water Utilities Installation

Clean and wastewater installed to water company specification, joined by butt fusion, electrofusion or mechanical fittings and welded up to 900mm.

illustrative — photography coming

Clean and dirty water can share a trench, but they're never worked on at the same time. Cross-contamination isn't a risk we take, so one system is completed before work starts on the other; if a wastewater issue turns up mid-job on a clean water main, that gets dealt with first. Joints are made by butt fusion, electrofusion or mechanical fittings, and we install to water company specification, fusion-welding up to 900mm diameter.

What this team covers

  • Butt fusion, electrofusion and mechanical joint connections, welding up to 900mm diameter
  • Clean and wastewater systems worked on separately, never at the same time
  • Installation to water company specification, including pressure testing and chlorination
  • Excavation using breakers, air tools and air lances around existing services, with temporary works fitted before work continues

What People Often Ask

Do you install clean and wastewater on the same job?

Yes, but the two systems are never worked on at the same time. One is completed before work starts on the other, and if a wastewater issue turns up mid-job on a clean water main, that gets dealt with first.

What's the difference between butt fusion and electrofusion?

Butt fusion heats and faces both pipe ends on a machine, then pushes them together to weld. Electrofusion uses a fitting with built-in heating elements that welds the joint from the inside once the pipe is in place. Where fusion isn't suitable, mechanical fittings are used instead.

Planning work that needs this team?

Send the details and get a proper quote back, not a boilerplate one.