Most contractor sites show you photos of holes and let you guess the rest. Each job here is written up as situation, challenge, solution and result, with the pipe sizes and methods included.
A 225mm PE fire main from Parliament Square to the gates — shaft, heading and a bespoke steel tie-in around a live HV cable clash.
CompletedFour water assets diverted by butt fusion, with the twin 800mm rising mains kept live throughout.
CompletedThe full depth of the shaft was refurbished, top to bottom, under confined space controls.
CompletedExcavate, cut out the failed section, repair properly, reinstate. The everyday job done once.
Send the situation and the constraints, and we'll tell you how we'd approach it.